Prepared by: AsiaQuartz Editorial Team
Technical review by: AsiaQuartz Product, QC & Supply Chain Team
Last updated: July 2026
Here’s something most importing guides won’t tell you: the hardest part of bringing quartz slabs from China isn’t the language barrier, the paperwork, or even the shipping. It’s the moment about four weeks in, when your container is somewhere in the Pacific and you’re lying awake wondering if those slabs actually look like the photos.
We’ve worked with enough first-time importers to know that feeling. We’ve also seen the same avoidable mistakes repeat themselves — wire transfers sent to suppliers who turned out to be trading companies posing as factories, containers arriving with slabs that were a completely different colour than the approved samples, customs delays that cost more in storage fees than the slabs themselves.
This guide exists because when we searched for “how to import quartz slabs from China,” every result was either a product catalogue, a three-paragraph blog post from 2019, or generic “how to import from China” advice that never mentioned slab dimensions, container math, or what an XRD report has to do with your customs paperwork.
So here it is — the guide we wish existed when we started. Practical. Specific to quartz. Written by people who’ve actually done this.
┌─────────────────────────────────────────────────────┐
│ Find Supplier → RFQ → Sample → Negotiate → Audit │
│ ↓ │
│ Order → Production → QC → Ship → Customs → Receive │
└─────────────────────────────────────────────────────┘
1. Find the Right Supplier (And Avoid the Wrong Ones)
This is where everything starts — and where the most expensive mistakes happen.
Where to Look
The Chinese quartz industry has two major production clusters: Yunfu (Guangdong) and Zaozhuang (Shandong). Yunfu is the larger and more established cluster — based on AsiaQuartz supply-chain experience, it is home to a high concentration of stone factories and trading companies. Zaozhuang has grown rapidly in the last decade and, based on our sourcing experience, is known for competitive pricing on mid-range quartz.
Your searching options, in order of reliability:
| Channel | Best For | Watch Out For |
|---|---|---|
| Industry trade shows (Xiamen Stone Fair, Coverings, Marmomac, KBIS) | Meeting factory owners face to face, seeing slabs in person, building relationships | Some booths are run by trading companies, not factories. Ask directly: “Are you the manufacturer?” |
| Made-in-China.com | Finding verified factories with export licences; quartz slab suppliers listed with company profiles and verification badges | “Gold Supplier” badges don’t mean factory-direct. Check the company profile for manufacturing capability. |
| Alibaba.com | Largest supplier pool; Trade Assurance for payment protection | Trading companies outnumber factories by a significant margin on general B2B platforms. Verify with factory audit videos or video calls showing production lines. |
| 1688.com | Domestic Chinese platform; often the same factories at lower displayed prices | Most sellers don’t speak English and don’t handle export logistics. Use for price benchmarking, not direct purchasing if you don’t have a Chinese-speaking agent. |
| Industry referrals | Highest trust — a supplier who’s already delivered for someone you know | Still verify. Your friend’s supplier might have changed formulation or QC staff since their last order. |
Red flag: unclear production responsibility. A supplier may be a factory, an export company, or a coordinated factory network. The risk is not the business model itself; the risk is refusing to identify who produces the slabs, who controls the approved specification, who signs off QC, and who is accountable when the order does not match.
Verify Who Controls Production and Accountability
Do not reduce supplier verification to “factory good, trading company bad.” A specialist supply company may coordinate multiple qualified factories more effectively than a single plant, while a factory can still provide weak documentation or inconsistent service. Verify control and accountability instead.
Ask these questions during your first call or video meeting:
- “Which legal entity will sign the PI and receive payment?” — The beneficiary name should match the contracting company and be verifiable.
- “Which facility will produce this SKU, and can you show the relevant line, warehouse and packing area?” — The answer should identify the actual production source, not just show unrelated factory footage.
- “Who approves colour, dimensions, QC records and release for shipment?” — You need a named process owner and a documented approval chain.
- “If production moves to another facility, how will I be informed and re-approve the product?” — Undisclosed factory switching is a major sample-to-bulk risk.
Common failure pattern. In sourcing disputes, the buyer often discovers too late that the contracting company did not own or directly control the production facility, and that responsibility for colour, packing or rework was never defined. A business-licence check, production-source verification and pre-shipment inspection are inexpensive compared with a disputed container.
2. Send Your RFQ (Request for Quotation) — and Do It Right
A vague RFQ gets you a vague quote. A precise RFQ gets you a quote you can actually compare against other suppliers and use for landed-cost calculation.
What a Quartz Slab RFQ Should Include
| Field | Example | Why It Matters |
|---|---|---|
| Colour/pattern reference | Calacatta Gold, or supplier SKU QZ-3056 | Different factories have different names for the same look. Attach photos. |
| Slab dimensions | 3200×1600mm, 20mm thickness | Jumbo (3200×1600) vs standard (3050×1450) affects price, packing, container count, and fabrication yield. Get this wrong and your fabricator can’t use the slabs. |
| Surface finish | Polished, both sides polished | If you need both sides polished for waterfall islands, specify it. Default single-side polished is cheaper. |
| Quantity | 400 m² (approx. 80 slabs at 3200×1600) | Quote per m²; confirm total slabs and container arrangement. |
| Incoterm | FOB Shenzhen or FOB Guangzhou | FOB = supplier handles everything to the port. CIF = supplier includes freight and insurance. Be specific about which port. |
| Packaging | A-frame wooden crate, seaworthy packing, fumigated | This is not a “nice to have.” Quartz slabs break in transit if packed wrong. Specify it. |
| Target lead time | 30 days from deposit | Sets expectations. If the supplier says 45 days, you know before you commit. |
| Payment terms preference | T/T 30% deposit, 70% before shipment | State your preference. Negotiation happens after you have quotes to compare. |
Reading the Quotes You Get Back
Note: The quote comparison below is an illustrative example based on typical market pricing patterns for mid-range Calacatta quartz from Chinese factories as of mid-2026. Actual prices depend on color, thickness, finish, order volume, and factory-specific factors. Use this as a framework for your own comparison, not as a price list.
Here’s an illustrative comparison of three quotes for the same Jumbo Calacatta specification, based on typical market pricing patterns as of mid-2026:
| Item | Supplier A (direct factory program) | Supplier B (alternative factory program) | Supplier C (coordinated supply company) |
|---|---|---|---|
| Price/m² FOB | $42 | $38 | $55 |
| MOQ | 200 m² / colour | 100 m² / colour | “Flexible” |
| Lead time | 25–30 days | 30–35 days | 20–25 days |
| Packaging | A-frame crate, included | A-frame crate, included | “Standard packing” — ask what that means |
| Samples | Free, buyer pays freight | $100/set, credited against order | Free |
| Factory visit | Welcome any time | 48 hours notice | “We’ll arrange” — red flag |
Supplier B has the lowest quoted price, but the decision should also consider lead time, sample approval, production transparency, QC capability, packing specification and the party responsible for corrective action. Supplier C should not be rejected simply because it coordinates production; it should be assessed on whether it discloses the producing facility, controls the specification and accepts contractual accountability. Supplier A may justify a higher price when its process reduces sample-to-bulk, packing and delivery risk.
This is exactly the kind of comparison you should be doing.
3. Order Samples — and Don’t Skip This Step
There is exactly one way to know what a quartz slab looks like: hold it in your hands, under real light, next to other samples.
Never order a full container based on photos alone. Factory photos are taken under controlled lighting, often colour-corrected, and may show a slab that was produced six months ago under different conditions. We’ve seen photos of pristine Calacatta White arrive as slabs with undertones so yellow they looked like butter. The supplier’s response: “This is the same product. Lighting is different in your country.” Sample. Every. Time.
Sample Checklist
- Request 15×15cm or 20×30cm sample pieces — larger is better for evaluating pattern and colour consistency
- Request samples from current production — not showroom pieces that have been handled and cleaned for years
- Request samples for EVERY colour you’re considering — don’t order five colours and sample only two
- Compare samples side by side under multiple light sources — daylight, warm LED, cool fluorescent. Quartz looks different under each.
- Test a sample piece — drop lemon juice and red wine on it. Let it sit for an hour. Wipe it off. If it stains, the resin quality is poor.
- Fabricate a test piece — cut it, polish the edge, check for chipping or unusual resin burning. Your fabricator will thank you.
- Retain approved samples — these become your reference standard for pre-shipment QC inspection
Sample shipping is usually via air courier (DHL, FedEx, UPS). Expect to pay $40–$120 for shipping depending on sample quantity and destination. Most factories offer free samples with buyer-paid freight; some deduct the sample cost from the first order.
4. Negotiate Terms — MOQ, Payment, Lead Time
MOQ (Minimum Order Quantity)
Chinese quartz factories typically set MOQ at 100–200 m² per colour. In practical terms:
- A 20ft container can hold approximately 110–130 standard slabs (3050×1450mm) or 70–85 jumbo slabs (3200×1600mm)
- That works out to roughly 500–550 m² per 20ft container for standard slabs
- For a mixed container with 3–4 colours, you’ll need roughly 150–200 m² per colour to fill a 20-footer
Some factories offer lower MOQ for stock colours at a 10–15% price premium. It’s worth asking if you’re testing a new market and don’t want to commit to full-container volume.
Payment Terms
| Term | Typical Arrangement | Buyer Risk Level |
|---|---|---|
| T/T 30/70 | 30% deposit with order, 70% before shipment | Medium — you pay balance before seeing the container |
| T/T 30/70 with balance against B/L copy | 30% deposit, 70% when shown shipping documents | Lower — documents confirm goods were loaded |
| Letter of Credit (L/C) | Bank guarantees payment against compliant documents | Low for buyer, high complexity — uncommon for first orders under $50k |
| Alibaba Trade Assurance | Platform holds payment until delivery confirmed | Lower — but covers platform orders only, not direct factory deals |
| T/T 100% upfront | Full payment before production | High — you have zero leverage once paid. Avoid unless it’s a long-established relationship. |
T/T 30/70 is the industry norm for first orders. If a supplier demands 50% or 100% upfront for a first order, treat that as a yellow flag. It doesn’t mean they’re dishonest — some small factories genuinely need the cash flow — but it does mean your leverage disappears once you wire the money.
Lead Time Reality Check
Factory-quoted lead times of “15–20 days” usually mean “15–20 production days starting from when we receive your deposit, confirming colour availability and assuming no public holidays.” In practice:
- Chinese New Year (January/February): add 3–5 weeks
- National Day (October 1–7): add 1–2 weeks
- Peak shipping season (August–October): port congestion can add 7–14 days
- Custom colour runs: add 10–15 days for formulation matching
For an order placed in late July 2026, a realistic total timeline from deposit to receiving goods at a US West Coast warehouse is roughly 9–11 weeks.
5. Factory Visit or Third-Party Audit (Critical for First Orders)
If you can visit, visit. If you can’t, hire someone who can.
What to Check During a Factory Visit
- Production lines: How many lines are running? Are they using modern vibro-compression presses (Breton-type or Chinese equivalents) or older equipment? A factory running one line at 30% capacity raises different questions than one running four lines at full tilt.
- Raw material storage: Is quartz aggregate stored properly (covered, dry, separated by grade)? Is resin stored in temperature-controlled conditions? Sloppy raw-material handling = inconsistent slab quality.
- Curing area: Are slabs curing for the specified time at the specified temperature? Rushed curing causes warping, poor polish, and premature resin degradation.
- QC station: Do they use controlled lighting and documented criteria for thickness, gloss, colour and surface defects? Ask for recent inspection records, non-conformance examples and evidence of corrective action.
- Finished goods warehouse: Are slabs stored vertically on A-frames or stacked flat? Flat stacking causes warping over time. Vertical on proper racks is the standard.
- Packing area: Watch how they pack a slab. Is it foam-wrapped, corner-protected, strapped securely into an A-frame crate? Or are they throwing slabs into a wooden frame with some bubble wrap?
- Export documentation: Can the contracting supplier show its export capability, recent shipment records or a clearly documented export arrangement? Confirm which entity appears on the commercial documents.
Third-Party Inspection Companies
If travel isn’t practical, third-party inspection companies (SGS, Bureau Veritas, Intertek, AsiaInspection/QIMA) can conduct factory audits and pre-shipment inspections for roughly $300–$500 per man-day in China. A factory audit typically takes one day; a pre-shipment QC inspection takes half a day to a full day depending on order size.
Budget ~$800 for a factory audit + pre-shipment inspection on a first order. On a $15,000 container order, that’s about 5%. Compare that to the cost of receiving a container of slabs that don’t match your approved samples — which can run to tens of thousands in lost sales, storage fees, and disposal costs — and it’s not expensive. It’s insurance.
6. Place the Order and Manage Production
The Proforma Invoice (PI)
The PI is your order contract. Before you sign it or wire a deposit, verify that it includes:
- Supplier’s full legal company name and address (match this against their business licence)
- Product description: colour name/SKU, slab dimensions, thickness, finish
- Quantity in m² and number of slabs
- Unit price and total value
- Incoterm (FOB, CIF, etc.) and named port
- Payment terms with exact percentages and triggers
- Production lead time from deposit receipt
- Packaging specification
- Bank details for wire transfer (beneficiary name must match the company name on the PI)
If the beneficiary name on the bank account is different from the company name on the PI, do not send money. This is a classic fraud indicator — either it’s a shell company, a personal account, or a middleman who may disappear after receiving payment. Legitimate factories use company bank accounts that match their business registration.
During Production: What to Track
- Week 1: Confirm deposit received, production schedule confirmed
- Week 2: Request in-progress photos of production (not just the factory floor — slabs on the line)
- Week 3: Confirm QC inspection date with your third-party inspector or schedule your own visit
- Week 4: QC inspection; confirm pass/fail and any rework requirements
- Week 5: Confirm packing, container booking, and shipping documents
A supplier who goes silent for two weeks during production isn’t necessarily a problem — many Chinese factories are production-focused, not communication-focused. But a supplier who can’t provide clear updates when asked should make you nervous.
7. Pre-Shipment QC Inspection — The Gate Before Your Money Leaves
This is the single most important step in the entire import process. Once the container leaves the factory gate, your ability to reject defective slabs drops to approximately zero.
What a Quartz Slab QC Inspection Checks
| Check | Method | Acceptance Criteria (Typical) |
|---|---|---|
| Colour match to approved sample | Side-by-side visual comparison under standard lighting | No visible colour deviation under D65 (daylight) and warm white (3000K) lighting |
| Thickness tolerance | Caliper measurement at multiple points per slab | ±0.5mm for 20mm slabs; ±1mm for 30mm slabs |
| Dimensional accuracy | Tape measure, diagonal check | ±2mm on length/width; diagonal difference ≤3mm |
| Surface defects | Visual inspection under angled lighting | No visible cracks, chips, pinholes, resin pooling, or colour streaks on the polished face |
| Polish quality | Visual + touch inspection | Uniform gloss across entire surface; no dull spots, swirl marks, or polishing lines |
| Edge condition | Visual inspection of all four edges | No chips, cracks, or resin separation along edges |
| Packing quality | Visual inspection of crating | Slabs separated with foam/plastic sheets; corners protected; crate structurally sound; fumigation stamp visible if required |
Sampling: How Many Slabs to Inspect
Following AQL (Acceptable Quality Limit) standards:
| Order Size (Slabs) | Inspect | Max Defectives (AQL 2.5, Normal) | Max Defectives (AQL 4.0, Normal) |
|---|---|---|---|
| 51–90 | 13 | 1 | 2 |
| 91–150 | 20 | 1 | 2 |
| 151–280 | 32 | 2 | 3 |
| 281–500 | 50 | 3 | 5 |
For quartz slabs, we recommend AQL 2.5 for colour and surface defects (tight), and AQL 4.0 for dimensional tolerances (slightly looser). A single slab with a visible crack or 3mm+ colour deviation should trigger a full re-inspection, not just rejection of that one slab — it may indicate a systemic production issue.
8. Shipping and Logistics — Container Math, Freight, and Insurance
Container Capacity for Quartz Slabs
| Container Type | Standard Slabs (3050×1450mm) | Jumbo Slabs (3200×1600mm) | Approx. m² |
|---|---|---|---|
| 20ft GP | 110–130 slabs | 70–85 slabs | 500–550 m² |
| 40ft GP | 240–260 slabs | 160–180 slabs | 1,100–1,200 m² |
| 40ft HQ (High Cube) | 270–290 slabs | 180–200 slabs | 1,250–1,350 m² |
Container loading is where slab specification becomes landed cost. You can’t change slab dimensions once production starts, but you need to know your container math before you finalise the order. Ordering 300 slabs at 3200×1600 won’t fit in a 40ft container — you’ll either pay for a second container (half empty) or need to reduce your order. Calculate the container arrangement before you sign the PI. For a detailed breakdown, see our Quartz Slab Weight & Container Loading Guide.
Freight Costs (Approximate, July 2026)
Note: The freight ranges below are indicative estimates based on general market conditions as of mid-2026. Actual rates depend on carrier, season, fuel surcharges, port congestion, and container availability. These figures are provided for initial budgeting only — always obtain a current quotation from your freight forwarder for your specific shipment.
| Route | 20ft Container | 40ft Container | Notes |
|---|---|---|---|
| Guangzhou/Shenzhen → US West Coast (LA/LB) | $1,800–$2,500 | $2,500–$3,500 | 25–30 days transit |
| Guangzhou/Shenzhen → US East Coast (NY/SAV) | $3,000–$4,500 | $4,000–$6,000 | 35–42 days transit; higher in peak season |
| Guangzhou/Shenzhen → Northern Europe (Rotterdam/Hamburg) | $2,200–$3,200 | $3,200–$4,500 | 30–35 days transit |
| Guangzhou/Shenzhen → Australia (Sydney/Melbourne) | $1,500–$2,200 | $2,200–$3,200 | 18–22 days transit |
| Guangzhou/Shenzhen → Middle East (Jebel Ali) | $1,400–$2,000 | $2,000–$2,800 | 15–18 days transit |
These are spot-market approximations. Freight rates fluctuate significantly with fuel prices, seasonality, and global shipping capacity. Always get a current quote from your freight forwarder before finalising your landed-cost calculation.
Freight Forwarder vs Doing It Yourself
Use a freight forwarder. Unless your company has a dedicated logistics department with experience in Chinese exports, containerised ocean freight, and destination-country customs brokerage, a forwarder will save you more than they cost.
A good freight forwarder handles:
- Booking container space with the shipping line
- Arranging inland transport from factory to port in China
- Export customs clearance at the Chinese port
- Ocean freight and marine insurance
- Import customs clearance at destination
- Inland delivery to your warehouse
Expect to pay $150–$350 in forwarder fees per container, plus the actual freight, customs duties, and inland transport costs.
Marine Insurance
Get it. A standard marine cargo insurance policy costs roughly 0.3–0.5% of the cargo value. On a $15,000 container, that’s $45–$75. It covers loss, damage, and total loss during ocean transit. Quartz slabs that shift during heavy seas and crack against each other is a real thing that happens. Don’t find out the hard way.
9. Customs Clearance — HS Codes, Tariffs, and Documentation
HS Code Classification
Classification and duty treatment depend on the exact product, composition, level of fabrication, origin, producer, exporter and destination-country rules. The information below is a review framework, not a customs entry instruction.
Engineered quartz and other artificial-stone products are commonly reviewed under HS heading 6810, but the final subheading can differ by product construction and destination. Provide your broker with the technical data sheet, composition, slab dimensions, photographs, fabrication status and country-of-origin information before shipment.
| Destination | What the importer should verify | Special caution |
|---|---|---|
| United States | HTS classification, ordinary duty, current general surcharges, Section 301 treatment if applicable, MPF/HMF and any product-specific trade remedy | Quartz surface products from China remain subject to existing antidumping and countervailing duty orders. In May 2026, the USITC also sent global safeguard remedy recommendations to the President; confirm the current presidential and customs status before quoting landed cost. |
| European Union | TARIC classification, customs duty, import VAT, product documentation and any applicable trade measures | Do not assume one EU rate applies to every member state or every product configuration. |
| Australia | Tariff classification, GST, biosecurity requirements and whether the product is legally permitted under the engineered-stone rules | Covered engineered-stone benchtops, panels and slabs containing at least 1% crystalline silica are prohibited from manufacture, supply, processing and installation. |
| United Kingdom / Canada / other markets | National tariff schedule, VAT/GST/HST, origin evidence, timber-packing rules and technical or project requirements | Use the destination-country schedule and a local customs broker; do not reuse another market’s classification. |
Official reference points, reviewed July 2026: USITC China AD/CVD sunset review; USITC safeguard remedy recommendations; Safe Work Australia engineered-stone ban. Always confirm the current legal and customs position for the actual shipment.
For US orders, never calculate landed cost from the base tariff alone. Product scope, producer/exporter combinations, antidumping and countervailing cash-deposit rates, general surcharges and any safeguard action can materially change the result. Obtain a written broker or trade-counsel review before making a delivered-price commitment.
Documents Commonly Required or Reviewed
- Bill of Lading (B/L) — carrier document identifying shipper, consignee, cargo and transport details.
- Commercial Invoice — seller, buyer, product description, value, currency, Incoterm and origin; include the customs classification when required or agreed with the broker.
- Packing List — slab and crate counts, dimensions, net/gross weight, marks and container details.
- Certificate or statement of origin — when required for customs, trade remedies, customer documentation or a valid preferential arrangement.
- Wood-packaging evidence — ISPM 15 marks and any additional certificate required by the destination; requirements depend on the packing material and market.
- Arrival notice and customs entry data — normally coordinated by the forwarder and customs broker.
- Advance cargo filing — for example, US ISF for applicable ocean shipments; deadlines and filing responsibility should be agreed before loading.
Ask your broker for a shipment-specific document list before the container is loaded. A document that is normal in one market may be unnecessary—or insufficient—in another.
Product-Specific Documentation
Technical documents may be requested by customs, regulators, distributors, fabricators or project consultants depending on the product and market:
- Technical Data Sheet (TDS) — composition overview, dimensions and physical-performance data
- Safety Data Sheet (SDS) — hazard and occupational-safety information tied to the supplied product
- Product-specific crystalline-silica test report — where silica content is a specification or regulatory issue; confirm the method, detection limit, test date and product/batch reference
- Conformity or performance documentation — where required by the destination market or project specification
- Batch QC and traceability records — linking the approved SKU, shipped slabs and commercial documents
For a dedicated verification framework, see our Silica-Free Quartz Procurement Guide.
10. Receive Your Container and Inspect
The container arrives at your warehouse. Before you sign the delivery receipt, before anyone touches a single slab:
- Photograph the container exterior — seal number, container number, any visible damage to the container itself
- Photograph the seal before breaking it — if the seal number doesn’t match the B/L, stop and document it immediately
- Open the container and photograph the loading arrangement — before moving anything
- Unload crate by crate, inspecting for visible damage — cracked crate = high probability of broken slabs inside
- Lay out a representative sample of slabs — at least 20% of the shipment — and compare to your approved reference sample
- Document everything — photos, notes, dated inspection report
If you find damage or discrepancies, document them immediately and notify (in this order): your freight forwarder, your insurance provider, and the supplier. Most marine insurance policies require damage notification within 3–7 days of delivery. Missing that window can void your claim.
Transit breakage should be measured, not normalised. Include a commercially reasonable contingency quantity when the project requires it, but do not treat a fixed percentage as universally acceptable. Compare actual breakage by packing method, route, carrier and handling record; investigate any result outside the agreed acceptance and claims process.
11. Common Importing Mistakes (and How to Avoid Them)
Mistake 1: Buying on price alone, ignoring landed cost. We’ve seen importers choose the $32/m² quote over the $42/m² quote, only to discover the cheaper supplier uses lower-grade packing that results in 12% breakage vs 3%. The $32 quote actually cost more per usable slab after breakage, insurance excess, and the hassle of re-ordering replacement pieces. Always calculate landed cost per usable slab, not per quoted m².
Mistake 2: Not specifying Incoterms clearly. “FOB Guangzhou” is clear. “Delivered to my warehouse” is clear if you’ve agreed CIF + inland delivery. “Including shipping” is not clear and has caused more disputes than any other phrase in import history. Pick an Incoterm, write it on the PI, and make sure both parties understand exactly where the supplier’s responsibility ends and yours begins.
Mistake 3: Reusing an old freight quote. Ocean freight, surcharges, equipment availability and inland delivery costs can change quickly. Request a current route-specific quote for every order and state how long the quote is valid.
Mistake 4: Skipping the pre-shipment QC. We said it earlier and we’ll say it again because it’s the mistake we see most often: $700 on a QC inspection before a $15,000 container ships is not optional. It’s the difference between catching a colour mismatch while the slabs are still in China (the supplier fixes it) and discovering the mismatch when the container is already at your warehouse (you’re stuck with it).
Mistake 5: Treating suppliers or production regions as interchangeable. Quality depends on the actual resin and filler system, colour-control process, curing discipline, calibration, traceability, inspection criteria and packing—not simply the city in which the factory is located. Evaluate the facility and the ordered SKU using measurable evidence.
Mistake 6: Forgetting destination-side costs. Landed cost may include customs duties and trade remedies, broker fees, port and terminal charges, demurrage risk, inland trucking, unloading labour, storage and packing disposal. Build the estimate from written quotations rather than a universal percentage of FOB value.
Before you place an order, cross-check the material and compliance scope in our silica-free surface sourcing and compliance overview.
12. Your First Import Checklist
- Define your specification — colour, dimensions, thickness, finish, quantity. Write it down. This becomes your RFQ.
- Research suppliers — trade shows, Made-in-China.com, Alibaba, referrals. Build a shortlist of 3–5 candidates.
- Verify factory status — request business licence, export licence, production line photos/video. Cross-check company name and registered address.
- Send identical RFQ to all shortlisted suppliers — same spec, same Incoterm, same port. Let them compete on price, quality, and service.
- Compare quotes on total landed cost — not just FOB price. Include freight, insurance, duties, destination handling, and an estimated breakage buffer.
- Order samples from top 2–3 suppliers — evaluate side by side under multiple light sources. Fabricate test pieces.
- Select supplier; negotiate final terms — PI, payment terms, lead time, packaging spec, QC inspection window.
- Factory audit or third-party inspection — before sending deposit if possible; otherwise, schedule for production week 2–3.
- Wire deposit (30% T/T typical); confirm receipt
- Track production; schedule pre-shipment QC
- Pre-shipment QC inspection — colour match, dimensions, surface quality, packing. Do not release balance payment until this passes.
- Book freight and arrange insurance — work with your forwarder; confirm B/L details, ISF filing (US), and customs broker.
- Wire balance payment; receive shipping documents
- Track vessel; prepare for customs clearance at destination
- Customs clearance → pay duties → arrange trucking to warehouse
- Receive container; inspect immediately; document everything
- File any damage claims within the insurance window
13.FAQ:
There is no reliable universal all-in figure. The result depends on slab specification, quantity, packing, route, freight, customs classification, origin, producer/exporter, trade remedies and destination charges. For US imports in particular, obtain a written duty and scope review before committing to a delivered price. Build the estimate from a current FOB quotation, freight quotation and broker calculation for the actual order.
Verify the contracting entity, payment beneficiary, actual producing facility, specification owner, QC process and corrective-action responsibility. A transparent supply company can be a strong partner, and a factory can still be weak. The decisive issue is whether the supplier discloses and controls the production and documentation chain.
The largest controllable risks are usually sample-to-bulk mismatch, unclear product scope or duty treatment, weak packing, and undocumented production changes. Retain approved samples, verify the producing facility, complete pre-shipment QC, agree the packing specification and obtain shipment-specific customs advice.
T/T can be appropriate after supplier verification, but no payment method replaces due diligence. Confirm that the beneficiary matches the contracting entity, define inspection and document-release conditions in the PI, and do not release the balance until the agreed QC and shipping conditions are satisfied. L/C or platform protection may be considered for suitable transactions.
For commercial quartz slab imports, a licensed customs broker is strongly recommended unless your company has equivalent in-house capability. The broker should review classification, origin, valuation, trade remedies, filings and destination requirements before shipment—not only after the vessel arrives.
Plan the timeline in stages: supplier verification and samples, production, pre-shipment QC, vessel booking, ocean transit, customs clearance and inland delivery. A first order commonly requires several months, and holidays, special colours, port congestion or customs review can add time. Set the required warehouse date first and work backwards with the supplier, forwarder and broker.